Scheduled Maintenance
Potential network outage due to Olympic Village works
| What | |
|---|---|
| When |
26 Mar 2008 22:00
to 27 Mar 2008 08:00 |
| Where | London |
| Contact Name | Gareth Bult |
| Contact Email | gareth@encryptec.net |
| Contact Phone | 0845 5082719 |
| Add event to calendar |
|
The work detailed below is scheduled to take place on the 26th of March 2008 between 22:30 PM and 27th of March 2008 08:00 AM. However, the service affecting time is scheduled to be no more than 30 minutes in total.
- Total time works will be service affecting : 30 minutes
- At Risk Time : 1 hour
- Affected : National network.
- Reason : Change over of existing Telehouse fibre cable to make way for the new swimming pool for the Olympic Village Affecting the National Link.
- Technical Details of Work: Change over of existing fibre cable for Olympic diversion.
- Action required : None